科技报告详细信息
Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 Testing | |
Link, H. ; LaCava, W. ; van Dam, J. ; McNiff, B. ; Sheng, S. ; Wallen, R. ; McDade, M. ; Lambert, S. ; Butterfield, S. ; Oyague, F. | |
关键词: BEARINGS; COMPUTERS; CONSULTANTS; ENGINEERS; FABRICATION; FINANCING; INCOME; LIFE CYCLE; LUBRICATION; MAINTENANCE; MANUFACTURERS; MANUFACTURING; MODIFICATIONS; PRICES; RELIABILITY; STANDARDIZATION; TESTING; TURBINES; VALIDATION; WIND TURBINES WIND ENERGY; WIND TURBINE; DRIVETRAIN; GEARBOX; Wind Energy; | |
DOI : 10.2172/1018489 RP-ID : NREL/TP-5000-51885 PID : OSTI ID: 1018489 Others : TRN: US201114%%167 |
|
学科分类:再生能源与代替技术 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
This report describes the Gearbox Reliability Collaborative's work at NREL to increase the reliability of wind turbine gearboxes.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201704210002101LZ | 6293KB | download |