科技报告详细信息
SSPA Equipment Engineering Feasibility Report
N.E. Woolstenhulme ; C.R. Clark
关键词: CONFIGURATION;    CONSTRUCTION;    IRRADIATION;    MACHINING;    PLATES;    POST-IRRADIATION EXAMINATION;    SAMPLE PREPARATION;    SPENT FUELS PIE;    RERTR;    SSPA;    U-Mo;   
DOI  :  10.2172/1035887
RP-ID  :  INL/EXT-11-23173
PID  :  OSTI ID: 1035887
Others  :  TRN: US1201300
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
In response to a demanding reactor conversion schedule, construction of the Shielded Sample Preparation Area (SSPA) was initiated in 2010 to augment the existing capabilities of the Hot Fuel Examination Facility (HFEF). While HFEF is and will remain the workhorse for post irradiation sample preparation, there is currently a large backlog of Post-Irradiation Examination (PIE) experiments caused by numerous competing projects (this backlog is expected to continue for the foreseeable future). HFEF, in its present configuration also lacks the ability to prepare samples suitable for several of the tests that have been identified for the successful conclusion of the RERTR program; these samples require fine detail machining of irradiated fuel plates.
【 预 览 】
附件列表
Files Size Format View
RO201704210001318LZ 1375KB PDF download
  文献评价指标  
  下载次数:1次 浏览次数:23次