科技报告详细信息
Drain Tank Information for Developing Design Basis of the Preliminary Design
Ferrada, Juan J1 
[1] ORNL
关键词: ACCIDENTS;    CAPACITY;    CLASSIFICATION;    DESIGN;    DESIGN BASIS ACCIDENTS;    DIVERTORS;    DRAINAGE;    DRYING;    HEAT EXCHANGERS;    HEAT TRANSFER;    HEATERS;    LOSS OF COOLANT;    MAINTENANCE;    PRESSURIZERS;    SAFETY;    TANKS;    VALVES;    WATER;   
DOI  :  10.2172/1037036
RP-ID  :  ORNL/TM-2012/25
PID  :  OSTI ID: 1037036
Others  :  Other: AT5512020
Others  :  ERATITM
Others  :  US ITER 12106-TD0003-R03
Others  :  TRN: US1201637
学科分类:原子、分子光学和等离子物理
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

Tokamak Cooling Water System (TCWS) drain tanks (DTs) serve two functions: normal operation and safety operation. Normal DTs are used for regular maintenance operations when draining is necessary. Safety DTs are used to receive the water leaked into the Vacuum Vessel (VV) after an in-vessel loss of coolant accident (LOCA) event. The preliminary design of the DTs shall be based on the information provided by this document. The capacity of the normal DTs is estimated based on the internal volume of in-vessel components [e.g., First Wall/Blanket (FW/BLK) and Divertor (DIV)]; Neutral Beam Injector (NBI) components; and TCWS piping, heat exchangers, electric heaters, pump casing, pressurizers, and valves. Water volumes have been updated based on 2004-design information, changes adopted because of approved Project Change Requests (PCRs), and data verification by US ITER and AREVA Federal Services, the US ITER A and E Company. Two tanks will store water from normal draining operations of the FW/BLK and DIV Primary Heat Transfer Systems (PHTSs). One tank will store water from normal draining operations of the NBI PHTS. The capacity of the safety DTs is based on analysis of a design basis accident: a large leak from in-vessel components. There are two safety DTs that will receive water from a VV LOCA event and drainage from the VV, as needed. In addition, there is one sump tank for the DIV that will be used for collecting drain water from the draining and drying processes and specifically for draining the DIV system as the DIV cassette lines are at a lower elevation than the DT connection point. Information documented in this report must be refined and verified during the preliminary design of the DTs, and there are several aspects to be considered to complete the preliminary design. Input to these design considerations is discussed in this report and includes, but is not limited to, water inventory; operating procedures/maintenance; Failure Modes and Effects Analysis (FMEA); tank layout and dimensions, including design margin; classification under French Nuclear Pressure Directives, Equipements Sous Pression Nucleaires (ESPN); and adaptations for construction.

【 预 览 】
附件列表
Files Size Format View
RO201704190004212LZ 4062KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:23次