科技报告详细信息
2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site
Becker, James M. ; Chamness, Michele A.
关键词: ANIMALS;    COLUMBIA RIVER;    HERBICIDES;    MANAGEMENT;    MONITORING;    WEEDS;    BATTELLE PACIFIC NORTHWEST LABORATORIES;    ENVIRONMENTAL EFFECTS;   
DOI  :  10.2172/1049664
RP-ID  :  PNNL-21164
PID  :  OSTI ID: 1049664
Others  :  TRN: US201218%%583
学科分类:环境科学(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the upland areas of the PNNL site in 2011. Efforts in 2011 to control noxious weed populations (comprising plant species designated as Class B noxious weeds by the Washington State Noxious Weed Control Board) discovered in 2009 and initially treated with herbicides in 2010 are described in Appendix B.
【 预 览 】
附件列表
Files Size Format View
RO201704190004053LZ 1031KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:27次