科技报告详细信息
Termination of Safeguards for Accountable Nuclear Materials at the Idaho National Laboratory
Michael Holzemer ; Alan Carvo
关键词: AR FACILITIES;    IDAHO;    IDAHO NATIONAL LABORATORY;    MANAGEMENT;    NUCLEAR ENERGY;    PHYSICAL PROTECTION;    REGULATIONS;    SAFEGUARDS;    SECURITY;    THEFT;    WASTE MANAGEMENT Accountable material;    disposition;   
DOI  :  10.2172/1042366
RP-ID  :  INL/EXT-12-24850
PID  :  OSTI ID: 1042366
Others  :  TRN: US1202854
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

Termination of safeguards ends requirements of Nuclear Material Control and Accountability (MC&A) and thereby removes the safeguards basis for applying physical protection requirements for theft and diversion of nuclear material, providing termination requirements are met as described. Department of Energy (DOE) M 470.4 6 (Nuclear Material Control and Accountability [8/26/05]) stipulates: 1. Section A, Chapter I (1)( q) (1): Safeguards can be terminated on nuclear materials provided the following conditions are met: (a) 'If the material is special nuclear material (SNM) or protected as SNM, it must be attractiveness level E and have a measured value.' (b) 'The material has been determined by DOE line management to be of no programmatic value to DOE.' (c) 'The material is transferred to the control of a waste management organization where the material is accounted for and protected in accordance with waste management regulations. The material must not be collocated with other accountable nuclear materials.' Requirements for safeguards termination depend on the safeguards attractiveness levels of the material. For attractiveness level E, approval has been granted from the DOE Idaho Operations Office (DOE ID) to Battelle Energy Alliance, LLC (BEA) Safeguards and Security (S&S). In some cases, it may be necessary to dispose of nuclear materials of attractiveness level D or higher. Termination of safeguards for such materials must be approved by the Departmental Element (this is the DOE Headquarters Office of Nuclear Energy) after consultation with the Office of Security.

【 预 览 】
附件列表
Files Size Format View
RO201704190003588LZ 1515KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:20次