科技报告详细信息
Technical Assessment for the CPC FD-7x-1500 Wind Turbine located at Tooele Army Base, Tooele Utah
Robert J. Turk ; Kurt S. Myers ; Jason W. Bush
关键词: Technical Assessment;    Tooele;    UT;    Wind;   
DOI  :  10.2172/1054711
RP-ID  :  INL/EXT-12-27071
PID  :  OSTI ID: 1054711
学科分类:再生能源与代替技术
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The CPC FD-7x-1500 Wind Turbine was installed with funding from the Energy Conservation Investment Program (ECIP). Since its installation, the turbine has been plagued with multiple operational upsets causing unacceptable down time. In an effort to reduce down time, the Army Corps of Engineers requested the Idaho National Laboratory conduct an assessment of the turbine to determine its viability as an operational turbine.

【 预 览 】
附件列表
Files Size Format View
RO201704190002183LZ 2390KB PDF download
  文献评价指标  
  下载次数:2次 浏览次数:10次