科技报告详细信息
Los Alamos National Laboratory and Lawrence Livermore National Laboratory Plutonium Sustainment Monthly Program Report September 2012
McLaughlin, Anastasia Dawn1  Storey, Bradford G.1  Bowidowicz, Martin1  Robertson, William G.1  Hobson, Beverly F.1 
[1] Los Alamos National Laboratory
关键词: Nuclear Physics & Radiation Physics(73);    AVAILABILITY;    CHEMISTRY;    CONCRETES;    DECOMMISSIONING;    FLOWSHEETS;    LANL;    LASERS;    LAWRENCE LIVERMORE NATIONAL LABORATORY;    MACHINING;    MANUFACTURING;    METALLURGY;    METRICS;    PLUTONIUM;    SCHEDULES;    WELDING;   
DOI  :  10.2172/1038873
RP-ID  :  LA-UR-12-20648
PID  :  OSTI ID: 1038873
Others  :  TRN: US1202116
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

In March of 2012 the Plutonium Sustainment program at LANL completed or addressed the following high-level activities: (1) Delivered Revision 2 of the Plutonium Sustainment Manufacturing Study, which incorporated changes needed due to the release of the FY2013 President's Budget and the delay in the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRRNF). (2) W87 pit type development activities completed a detailed process capability review for the flowsheet in preparation for the Engineering Development Unit Build. (3) Completed revising the Laser Beam Welding schedule to address scope and resource changes. (4) Completed machining and inspecting the first set of high-fidelity cold parts on Precitech 2 for Gemini. (5) The Power Supply Assembly Area started floor cutting with a concrete saw and continued legacy equipment decommissioning. There are currently no major issues associated with achieving MRT L2 Milestones 4195-4198 or the relevant PBIs associated with Plutonium Sustainment. There are no budget issues associated with FY12 final budget guidance. Table 1 identifies all Baseline Change Requests (BCRs) that were initiated, in process, or completed during the month. The earned value metrics overall for LANL are within acceptable thresholds, so no high-level recovery plan is required. Each of the 5 major LANL WBS elements is discussed in detail.