科技报告详细信息
A First Preliminary Look: Are Corridor Charging Stations Used to Extend the Range of Electric Vehicles in The EV Project?
John Smart
关键词: BEV;    EVSE;    The EV Project;   
DOI  :  10.2172/1073782
RP-ID  :  INL/EXT-13-28269
PID  :  OSTI ID: 1073782
学科分类:航空航天科学
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

A preliminary analysis of data from The EV Project was performed to begin answering the question: are corridor charging stations used to extend the range of electric vehicles? Data analyzed were collected from Blink brand electric vehicle supply equipment (EVSE) units based in California, Washington, and Oregon. Analysis was performed on data logged between October 1, 2012 and January 1, 2013. It should be noted that as additional AC Level 2 EVSE and DC fast chargers are deployed, and as drivers become more familiar with the use of public charging infrastructure, future analysis may have dissimilar conclusions.

【 预 览 】
附件列表
Files Size Format View
RO201704180004654LZ 969KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:14次