科技报告详细信息
Lagoon Seepage Testing Report for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory, Butte County, Idaho
Bridger Morrison
关键词: Central Facilities Area;    CFA STP Seepage Test;    JUB Engineers;    Lagoon Seepage Test;    Sewage Treatment Plant;   
DOI  :  10.2172/1170323
RP-ID  :  INL/EXT-14-33307
PID  :  OSTI ID: 1170323
学科分类:社会科学、人文和艺术(综合)
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

J-U-B ENGINEERS, Inc. (J-U-B) performed seepage tests on the CFA Wastewater Lagoons 1, 2, and 3 between August 26th and September 22nd, 2014. The lagoons were tested to satisfy the Idaho Department of Environmental Quality (DEQ) Rules (IDAPA 58.01.16) that require all lagoons be tested at a frequency of every 10 years and the Compliance Activity CA-141-03 in the DEQ Wastewater Reuse Permit for the CFA Sewage Treatment Plant (LA-000141-03). The lagoons were tested to determine if the average seepage rates are less than 0.25 in/day, the maximum seepage rate allowed for lagoons built prior to April 15, 2007. The average seepage rates were estimated for each lagoon and are given in Table-ES1. The average seepage rates for Lagoons 1 and 2 are less than the allowable seepage rate of 0.25 in/day. Lagoon 1 and 2 passed the seepage test and will not have to be tested again until the year 20241. However, the average seepage rate for Lagoon 3 appears to exceed the allowable seepage rate of 0.25 in/day which means the potential source for the excessive leakage should be investigated further.

【 预 览 】
附件列表
Files Size Format View
2532KB PDF download
  文献评价指标  
  下载次数:4次 浏览次数:26次