科技报告详细信息
Lac Courte Oreilles Hydro Dam Assessment
Weaver, Jason1  Meyers, Amy2 
[1] Lac Courte Oreilles, Hayward, WI (United States);Kiser Hydro, LLC, Norway, MI (United States)
关键词: Lac Courte Oreilles;    hydroelectric;    feasibility study;    Tribe;   
DOI  :  10.2172/1177137
RP-ID  :  EE0002514--000
PID  :  OSTI ID: 1177137
学科分类:再生能源与代替技术
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

【 预 览 】
附件列表
Files Size Format View
16262KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:15次