科技报告详细信息
AGR-5/6/7 LEUCO Kernel Fabrication Readiness Review
Marshall, Douglas W.1  Bailey, Kirk W.2 
[1] Idaho National Lab. (INL), Idaho Falls, ID (United States). Fuel Design and Development;Idaho National Lab. (INL), Idaho Falls, ID (United States). ART Quality Assurance Engineer
关键词: AGR-5/6/7;    Fabrication;    Fuels;    Kernel;    LEUCO;    TRISO;   
DOI  :  10.2172/1178370
RP-ID  :  INL/EXT--15-34306
PID  :  OSTI ID: 1178370
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

In preparation for forming low-enriched uranium carbide/oxide (LEUCO) fuel kernels for the Advanced Gas Reactor (AGR) fuel development and qualification program, Idaho National Laboratory conducted an operational readiness review of the Babcock & Wilcox Nuclear Operations Group ??? Lynchburg (B&W NOG-L) procedures, processes, and equipment from January 14 ??? January 16, 2015. The readiness review focused on requirements taken from the American Society Mechanical Engineers (ASME) Nuclear Quality Assurance Standard (NQA-1-2008, 1a-2009), a recent occurrence at the B&W NOG-L facility related to preparation of acid-deficient uranyl nitrate solution (ADUN), and a relook at concerns noted in a previous review. Topic areas open for the review were communicated to B&W NOG-L in advance of the on-site visit to facilitate the collection of objective evidences attesting to the state of readiness.

【 预 览 】
附件列表
Files Size Format View
3025KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:22次