科技报告详细信息
| Final report on Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in Texas | |
| Luchini, Chris B.1  | |
| [1] Universal GeoPower LLC, Houston, TX (United States) | |
| 关键词: Co-produced geothermal brine; | |
| DOI : 10.2172/1208636 RP-ID : Final 1.1 PID : OSTI ID: 1208636 |
|
| 学科分类:再生能源与代替技术 | |
| 美国|英语 | |
| 来源: SciTech Connect | |
PDF
|
|
【 摘 要 】
The initial geothermal brine flow rate and temperature from the re-worked well were insufficient, after 2.5 days of flow testing, to justify advancing past Phase I of this project. The flow test was terminated less than 4 hours from the Phase I deadline for activity, and as such, additional flow tests of 2+ months may be undertaken in the future, without government support.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 2149KB |
PDF