科技报告详细信息
Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015 | |
Truex, Michael J.1  Strickland, Christopher E.1  Oostrom, Martinus1  Johnson, Christian D.1  Tartakovsky, Guzel D.1  Johnson, Timothy C.1  Clayton, Ray E.1  Chronister, Glen B.1  | |
[1] Pacific Northwest National Lab. (PNNL), Richland, WA (United States) | |
关键词: vadose zone; remediation; | |
DOI : 10.2172/1224516 RP-ID : PNNL--24706 PID : OSTI ID: 1224516 Others : Other: 830403000 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
4618KB | download |