科技报告详细信息
Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015
Truex, Michael J.1  Strickland, Christopher E.1  Oostrom, Martinus1  Johnson, Christian D.1  Tartakovsky, Guzel D.1  Johnson, Timothy C.1  Clayton, Ray E.1  Chronister, Glen B.1 
[1] Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
关键词: vadose zone;    remediation;   
DOI  :  10.2172/1224516
RP-ID  :  PNNL--24706
PID  :  OSTI ID: 1224516
Others  :  Other: 830403000
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

【 预 览 】
附件列表
Files Size Format View
4618KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:29次