科技报告详细信息
Delivery of completed irradiation vehicles and the quality assurance document to the High Flux Isotope Reactor for irradiation
Petrie, Christian M.1  McDuffee, Joel Lee1  Katoh, Yutai1  Terrani, Kurt A.1 
[1] Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
关键词: FABRICATION;    SPECIFICATIONS;    SILICON CARBIDES;    HFIR REACTOR;    IRRADIATION CAPSULES;    VALIDATION;    QUALITY ASSURANCE;    FUEL CANS;    DELIVERY;    DOCUMENTATION;    COMPOSITE MATERIALS;    STRESSES;    TUBES;   
DOI  :  10.2172/1222574
RP-ID  :  ORNL/LTR--2015/569
PID  :  OSTI ID: 1222574
Others  :  Other: AF5810000
Others  :  NEAF278
Others  :  TRN: US1500852
学科分类:核能源与工程
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This report details the initial fabrication and delivery of two Fuel Cycle Research and Development (FCRD) irradiation capsules (ATFSC01 and ATFSC02), with associated quality assurance documentation, to the High Flux Isotope Reactor (HFIR). The capsules and documentation were delivered by September 30, 2015, thus meeting the deadline for milestone M3FT-15OR0202268. These irradiation experiments are testing silicon carbide composite tubes in order to obtain experimental validation of thermo-mechanical models of stress states in SiC cladding irradiated under a prototypic high heat flux. This document contains a copy of the completed capsule fabrication request sheets, which detail all constituent components, pertinent drawings, etc., along with a detailed summary of the capsule assembly process performed by the Thermal Hydraulics and Irradiation Engineering Group (THIEG) in the Reactor and Nuclear Systems Division (RNSD). A complete fabrication package record is maintained by the THIEG and is available upon request.

【 预 览 】
附件列表
Files Size Format View
1134KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:29次