科技报告详细信息
Preliminary Report on Oak Ridge National Laboratory Testing of Drake/ACSS/MA2/E3X | |
Irminger, Philip1  King, Daniel J.1  Herron, Andrew N.1  Davis, Cody2  Temple, Bill2  Baker, Gord2  Li, Zhi1  Starke, Michael R.1  Ollis, T. Ben1  | |
[1]Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States) | |
[2]General Cable Corporation, Highland Heights, KY (United States) | |
DOI : 10.2172/1237155 RP-ID : ORNL/TM-2015/549 PID : OSTI ID: 1237155 Others : Other: TE1101000 Others : CETE004 |
|
学科分类:电力 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
A key to industry acceptance of a new technology is extensive validation in field trials. The Powerline Conductor Accelerated Test facility (PCAT) at Oak Ridge National Laboratory (ORNL) is specifically designed to evaluate the performance and reliability of a new conductor technology under real world conditions. The facility is set up to capture large amounts of data during testing. General Cable used the ORNL PCAT facility to validate the performance of TransPowr with E3X Technology a standard overhead conductor with an inorganic high emissivity, low absorptivity surface coating. Extensive testing has demonstrated a significant improvement in conductor performance across a wide range of operating temperatures, indicating that E3X Technology can provide a reduction in temperature, a reduction in sag, and an increase in ampacity when applied to the surface of any overhead conductor. This report provides initial results of that testing.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
3788KB | download |