Extraction-Scrub-Strip test results from the interim Salt Disposition Program Macrobatch 9 Tank 21H qualification samples | |
Peters, T.1  | |
[1] Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL) | |
关键词: SOLVENT EXTRACTION; CESIUM; TANKS; SALTS; SOLUTIONS; SAVANNAH RIVER PLANT; SOLVENTS; DECONTAMINATION; RADIOACTIVE W; | |
DOI : 10.2172/1240866 RP-ID : SRNL--STI-2016-00078 PID : OSTI ID: 1240866 Others : TRN: US1600685 |
|
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D(Cs) model
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
283KB | download |