期刊论文详细信息
Scientific Reports 卷:16
Assessing the impact of construction material waste drivers on project cost overrun across material processing stages: a structural equation modeling approach
Article
Lobna Kamal1  Mohamed S. Yamany1  Hossam E. Hosny1 
[1] Department of Construction Engineering, Faculty of Engineering, Zagazig University, 44519, Zagazig, Egypt
关键词: Construction projects;    Material waste;    Cost overruns;    Structural equation modeling;    PLS-SEM;   
DOI  :  10.1038/s41598-026-63008-x
 received in 2026-05-08, accepted in 2026-07-15,  发布年份 2026
来源: Springer
PDF
【 摘 要 】

A considerable quantity of materials supplied to construction sites becomes waste, hence escalating project costs. Nevertheless, research lacks a thorough assessment of the intricate, indirect, and non-linear correlation between material waste drivers at different processing stages and project cost overruns. This research study investigates this correlation using an advanced multivariate statistical technique known as structural equation modeling (SEM). Data were collected through a questionnaire survey to evaluate the construction material waste factors (CMWFs) and their association with cost overruns in construction projects in Egypt. An exploratory factor analysis was conducted to categorize CMWFs into material processing phases: (1) design and documentation, (2) material procurement, (3) material handling, storage, and transportation, and (4) on-site management. An SEM model was developed to uncover the impact of latent material processing phases on project cost overruns. The model’s consistency, reliability, and accuracy were verified employing various performance metrics, including Cronbach’s Alpha, composite reliability, and root mean squared error. The results demonstrate that factors related to material handling, storage, and transportation exhibit the highest correlation and impact on project cost overruns, as reflected by an R2 value of 0.441 and a p-value below 0.05. This research helps decision-makers prioritize mitigation strategies for material waste and cost overruns, hence enhancing construction project performance.

【 授权许可】

CC BY-NC-ND   
© The Author(s) 2026

【 预 览 】
附件列表
Files Size Format View
RO202609300001371ZK.pdf 2202KB PDF download
Fig. 2 788KB Image download
RO202609300000877ZK.pdf 2442KB PDF download
Fig. 5 1249KB Image download
Fig. 3 1141KB Image download
Fig. 1 1819KB Image download
Fig. 6 136KB Image download
【 图 表 】

Fig. 6

Fig. 1

Fig. 3

Fig. 5

Fig. 2

【 参考文献 】
  • [1]
  • [2]
  • [3]
  • [4]
  • [5]
  • [6]
  • [7]
  • [8]
  • [9]
  • [10]
  • [11]
  • [12]
  • [13]
  • [14]
  • [15]
  • [16]
  • [17]
  • [18]
  • [19]
  • [20]
  • [21]
  • [22]
  • [23]
  • [24]
  • [25]
  • [26]
  • [27]
  • [28]
  • [29]
  • [30]
  • [31]
  • [32]
  • [33]
  • [34]
  • [35]
  • [36]
  • [37]
  • [38]
  • [39]
  • [40]
  • [41]
  • [42]
  • [43]
  • [44]
  • [45]
  • [46]
  • [47]
  • [48]
  • [49]
  • [50]
  • [51]
  • [52]
  • [53]
  • [54]
  • [55]
  • [56]
  • [57]
  • [58]
  • [59]
  • [60]
  • [61]
  • [62]
  • [63]
  • [64]
  • [65]
  • [66]
  • [67]
  • [68]
  • [69]
  • [70]
  • [71]
  • [72]
  • [73]
  • [74]
  • [75]
  • [76]
  • [77]
  • [78]
  • [79]
  • [80]
  • [81]
  • [82]
  • [83]
  • [84]
  • [85]
  • [86]
  • [87]
  • [88]
  • [89]
  • [90]
  • [91]
  • [92]
  • [93]
  文献评价指标  
  下载次数:0次 浏览次数:0次