期刊论文详细信息
JOURNAL OF ENVIRONMENTAL MANAGEMENT 卷:197
Comparative life cycle cost assessment of painted and hot-dip galvanized bridges
Article
Rossi, B.1  Marquart, S.2  Rossi, G.3 
[1] Katholieke Univ Leuven, Dept Civil Engn, Leuven, Belgium
[2] Nuremberg Inst Technol Georg Simon Ohm, Nurnberg, Germany
[3] Chenee Royal Coll, Liege, Belgium
关键词: Life cycle cost assessment;    Steel bridge;    Painted;    Hot-dip galvanizing;    Maintenance scenario;   
DOI  :  10.1016/j.jenvman.2017.03.022
来源: Elsevier
PDF
【 摘 要 】

The study addresses the life cycle cost assessment (LCCA) of steel bridges, focusing on the maintenance activities and the maintenance scenario. Firstly, the unit costs of maintenance activities and their durability (i.e. the time between two activities) are evaluated. Pragmatic data are provided for the environment category C4 and for three activities: Patch Up, Overcoating and Remove & Replace. A comparative LCCA for a typical hypothetic steel girder bridge is carried out, either painted or hot-dip galvanized (HDG), in the environmental class C4. The LCC versus the cumulated life is provided for both options. The initial cost of the steel unpainted option is only 50.3% of the HDG option. It is shown that after 'Overcoating' occurring at 18.5 years, the total Net Present Value (NPV) of the painted option surpasses that of the HDG option. A sensitivity analysis of the NPV to the cost and service life parameters, the escalation and discount rates is then performed. The discount and escalation rates, considerably influences the total LCC, following a non-linear trend. The total LCC decreases with the discount rate increasing and, conversely, increases with the escalation rate increasing. Secondly, the influence of the maintenance scenario on the total LCC is assessed based on a probabilistic approach. A permutation of the three independent maintenance activities assumed to occur six times over the life of the bridge is considered and a probability of occurrence is associated to each unique scenario. The most probable scenarios are then classified according to their NPV or achieved service life. This approach leads to the definition of a cost-effective maintenance scenario i.e. the scenario, within all the considered permutations, that has the minimum LCC in a range of lifespan. Besides, the probabilistic analysis also shows that, whatever the scenario, the return on investment period ranges between 18.5 years and 24.2 years. After that period, the HDG option becomes economic. (C) 2017 Elsevier Ltd. All rights reserved.

【 授权许可】

Free   

【 预 览 】
附件列表
Files Size Format View
10_1016_j_jenvman_2017_03_022.pdf 828KB PDF download
  文献评价指标  