JOURNAL OF CLEANER PRODUCTION | 卷:176 |
A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages | |
Article | |
Ding, Zhikun1,2  Zhu, Menglian1  Tam, Vivian W. Y.1,3  Yi, Guizhen4  Tran, Cuong N. N.3  | |
[1] Shenzhen Univ, Coll Civil Engn, Shenzhen, Peoples R China | |
[2] Shenzhen Univ, Smart City Res Inst, Shenzhen, Peoples R China | |
[3] Western Sydney Univ, Sch Comp Engn & Math, Locked Bag 1797, Penrith, NSW 2751, Australia | |
[4] Land Management Ctr Baoan Dist, Shenzhen, Peoples R China | |
关键词: Design and construction stage; Construction waste minimization; Environmental benefits; System dynamics; | |
DOI : 10.1016/j.jclepro.2017.12.101 | |
来源: Elsevier | |
【 摘 要 】
Construction waste generation and its environmental impact reduction have become an urgent issue to be solved with the acceleration of urbanization process in China. However, limited research has been conducted to cover both the design stage and the construction stage such that the overall construction waste reduction outcome could be comprehensively assessed. Based on interview data and literature review, Vensim software was used to build a two-stage environmental benefit assessment system dynamics (SD) model which covered construction waste reduction management subsystem, waste generation and disposal subsystem, and environmental benefit assessment subsystem. Simulation results highlight that the reduction management can reduce 40.63% of waste generation. In the meantime, the reduction management achieves good environmental benefits including the reduction of greenhouse-gas emissions of 12,623.30 kg, saving waste landfill of 3901.05 m(3) and reducing the use of public vacant site for the illegal dumping of 688.42 m(3). The simulation results demonstrate that the dynamic model could assess the environmental benefits of construction waste reduction effectively at the design and the construction stage. This research can provide insight to the design and construction professionals for waste reduction measures such as prefabricated components application, reduced design modification at the design stage, on-site sorting and material reuse at the construction stage, and to provide references for governments in assessing the reduction management outcomes of construction projects and the environmental benefits. (C) 2017 Elsevier Ltd. All rights reserved.
【 授权许可】
Free
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
10_1016_j_jclepro_2017_12_101.pdf | 4260KB | download |