期刊论文详细信息
FOREST ECOLOGY AND MANAGEMENT 卷:386
Comment on A simple way to incorporate uncertainty and risk into forest harvest scheduling
Editorial Material
Eyvindson, Kyle1  Kangas, Annika2 
[1] Univ Jyvaskyla, Dept Biol & Environm Sci, POB 35, Jyvaskyla 40014, Finland
[2] Nat Resources Inst Finland Luke, Econ & Soc, POB 68, Joensuu 80101, Finland
关键词: Stochastic programming;    Risk;    Uncertainty;    Conditional Value at Risk;   
DOI  :  10.1016/j.foreco.2016.03.038
来源: Elsevier
PDF
【 摘 要 】

In a recent research article, Robinson et al. (2016) described a method of estimating uncertainty of harvesting outcomes by analyzing the historical yield to the associated prediction for a large number of harvest operations. We agree with this analysis, and consider it a useful tool to integrate estimates of uncertainty into the optimization process. The authors attempt to manage the risk using two different methods, based on deterministic integer linear programming. The first method focused on maximizing the 10th quantile of the distribution of predicted volume subject to area constraint, while the second method focused on minimizing the variation of total quantity of volume harvested subject to a harvest constraint. The authors suggest that minimizing the total variation of the harvest could be a useful tool to manage risk. Managing risks requires trade-offs, however, typically less risk involves higher costs. The authors only superficially stated the costs and did not consider if these costs are reasonable for the management of risk. In this comment, we specifically develop the models used in their article, and demonstrate a method of managing the downside risk by utilizing the Conditional Value at Risk. (C) 2016 Elsevier B.V. All rights reserved.

【 授权许可】

Free   

【 预 览 】
附件列表
Files Size Format View
10_1016_j_foreco_2016_03_038.pdf 628KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:1次