期刊论文详细信息
Građevinar
Multicriteria assessment of unfinished construction projects
article
Marius Lazauskas1  Vladislavas Kutut1  Edmundas Kazimieras Zavadskas1 
[1] Vilnius Gediminas Technical University, Lithuania Faculty of Civil Engineering
关键词: AHP;    ARAS;    MOORA;    MULTIMOORA;    construction projects;    unfinished buildings;   
DOI  :  10.14256/JCE.1179.2014
学科分类:社会科学、人文和艺术(综合)
来源: Hrvatsko Drustvo Gradevinskih Inzenjera
PDF
【 摘 要 】

Possible ways for assessing completion of unfinished residential buildings to achieve appropriate construction project objectives are presented in the paper. The developed model enables an efficient assessment of unfinished projects in Vilnius, the capital of Lithuania. Unfinished building solutions, expressed through indicators, were selected and used to formulate a multicriteria task to be solved by combinations of methods AHP+ARAS, MOORA and MULTIMOORA. A computational model was created and adjusted for a simple and efficient assessment of the adequacy of investment projects in many areas of construction.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO202307150003683ZK.pdf 334KB PDF download
  文献评价指标  
  下载次数:0次 浏览次数:0次