期刊论文详细信息
| Građevinar | |
| Work cycle based scheduling | |
| article | |
| Dejan Marinković1  Zoran Stojadinović1  Nenad Ivanišević1  | |
| [1] University of Belgrad Faculty of Civil Engineering | |
| 关键词: productivity; short-term schedules; workflow; work cycle; | |
| DOI : 10.14256/JCE.845.2013 | |
| 学科分类:社会科学、人文和艺术(综合) | |
| 来源: Hrvatsko Drustvo Gradevinskih Inzenjera | |
PDF
|
|
【 摘 要 】
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a case study of constructing seven multi-storey structures. It was concluded that WCBS helps overcome restrictions of existing approaches to micro scheduling (daily tasks and crew coordination), enhances the scheduling process and increases productivity of works.
【 授权许可】
CC BY
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| RO202307150003605ZK.pdf | 1119KB |
PDF