期刊论文详细信息
Građevinar
Work cycle based scheduling
article
Dejan Marinković1  Zoran Stojadinović1  Nenad Ivanišević1 
[1] University of Belgrad Faculty of Civil Engineering
关键词: productivity;    short-term schedules;    workflow;    work cycle;   
DOI  :  10.14256/JCE.845.2013
学科分类:社会科学、人文和艺术(综合)
来源: Hrvatsko Drustvo Gradevinskih Inzenjera
PDF
【 摘 要 】

The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a case study of constructing seven multi-storey structures. It was concluded that WCBS helps overcome restrictions of existing approaches to micro scheduling (daily tasks and crew coordination), enhances the scheduling process and increases productivity of works.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO202307150003605ZK.pdf 1119KB PDF download
  文献评价指标  
  下载次数:3次 浏览次数:0次