Građevinar
S-curve modelling in early phases of construction projects
article
Mladen Radujković1  Nives Ostojić-Škomrlj2 
[1] University of Zagreb Faculty of Civil Engineering;University of Split Faculty of Civil Engineering, Arch. and Geodesy
关键词: tunnels;    motorways;    building engineering;    construction planning;    S-curve;    regression models;    cost scheduling;   
DOI  :  10.14256/JCE.714.2012
学科分类:社会科学、人文和艺术(综合)
来源: Hrvatsko Drustvo Gradevinskih Inzenjera
PDF
【 摘 要 】

The methodological procedure for forecasting cost distribution over time is given for the project realization phase using cost s-curves for three different types of structures: building, tunnel, and motorway. Three different approaches are used, and their results are correlated and presented in form of mathematical regression expressions and appropriate diagrams. The proposed methodology can be used for cash flow forecasting during all phases of construction projects, specially in the earliest phase in which detailed nformation about the project is scarce.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO202307150003537ZK.pdf 1169KB PDF download
  文献评价指标  
  下载次数:0次 浏览次数:1次