期刊论文详细信息
Silva Balcanica
A short review on studies on work productivity of mechanical tree planting
article
Mohammad Reza Ghaffariyan1  Ivailo Markoff2 
[1] University of the Sunshine Coast;Forest Research Institute
关键词: Planting;    Mechanical planter;    Work productivity;    Seedling;    Product machine hours;   
DOI  :  10.3897/silvabalcanica.22.e64233
学科分类:植物学
来源: Pensoft
PDF
【 摘 要 】

Reforestation can be carried out using natural regeneration or artificial regeneration. There are vari-ous methods for the artificial regeneration, including manual planting, mechanical planting and aerial/or ground seeding. This article aimed to review the current reports on the productivity of mechanical planting to provide a summary of productivity rates for the planting machines. According to the review’s results, mechanical planting productivity may vary from 143 to 475 seedlings per productive machine hours depending on the machine type, environment (such as surfaces obstacles and stoniness) and the operator experience. Employing skilled operators and selecting suitable worksites can help increasing the work productivity. Integrating and optimising the whole planting chain, from the nursery to the plant-ing phase, can assist also with reducing the cost and improving the productivity. As mechanical planting machines get more widely adopted in different countries, their overall efficiency will improve over time.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO202307130002754ZK.pdf 1135KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:1次