International Journal of Entrepreneurship and Business Development: IJEBD
The Analysis Performance of Project Delays in Pile Foundation Work : A Case Study Batam Island
article
Steven Shui1  Andri Irfan Rifai1  Mulia Pamadi1 
[1] Department of Civil Engineering & Planning, Universitas Internasional Batam
关键词: Construction;    Delay Factors;    Pile Foundation;    Project;   
DOI  :  10.29138/ijebd.v6i1.2158
来源: LPPM of Narotama University Surabaya
PDF
【 摘 要 】

Purpose: Delays are common in construction projects. The term "project delay" refers to a project's completion date later than anticipated. Lack of performance by contractors or project managers in resolving issues can result in project delays. The factors that cause project delays must be considered to reduce delays. This study aims to examine the elements contributing to Batam island’s pile foundation construction delays. Findings: The factor of delays is an important key of the analysis to prevent delays in future projects Design/methodology/approach: This research uses a case study at Batam Island. The analysis is done with SPSS 26 program. Research limitations/implications: Analysis of delay caused by pile foundation in Batam island. Practical implications: Analysis of the delay caused by a project according to the result of the questionnaire.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO202307110004720ZK.pdf 401KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:3次