An application of reinforced concrete vaulted slabs and rafts in deep excavation works
article
Grzegorz Kacprzak1  Tomasz Daktera2  Andrzej Stańczyk3  Urszula Tomczak1  Seweryn Bodus3  Michał Werle3 
[1] Warsaw University of Technology, Faculty of Civil Engineering;Soletanche Bachy International 280 Avenue Napoléon Bonaparte;Warbud S.A.
关键词: metro station construction;    urban construction;    construction stages;    soil-structure interaction;    diaphragm wall;    vaulted slab;    deep excavation;   
DOI  :  10.24425/ace.2021.138043
学科分类:建筑学
来源: Polska Akademia Nauk * Instytut Podstawowych Problemow Techniki / Polish Academy of Sciences, Institute of Fundamental Technological Research
PDF
【 摘 要 】

The overall efficiency of a construction of a deep excavation urban project does not depend only on the duration of the construction but also on its influence on the urban environment and the traffic [9, 10]. These two things depend greatly on the excavation method and the construction stages defined during the design process. This paper describes the construction stages of three metro stations (two stations in Warsaw and one in Paris) and discusses their advantages and disadvantages including among other things its impact on neighbouring infrastructure and the city’s traffic. An important conclusion drawn from this analysis is that the shape of the slabs used can considerably affect the design and the construction stages. For example, a vaulted top slab allows an almost immediate traffic restoration and a vaulted bottom raft allows a much shorter dewatering period.