| Environmental Sciences Proceedings | |
| Intervention Time of Porous Asphalt Mixture Evaluation to Prevent Clogging | |
| article | |
| Emmanuelle Stefânia Holdefer Garcia1  Liseane Padilha Thives1  | |
| [1] Department of Civil Engineering, Federal University of Santa Catarina—Campus Florianópolis | |
| 关键词: porous asphalt mixture; clogging; intervention time; | |
| DOI : 10.3390/ECWS-7-14196 | |
| 来源: mdpi | |
PDF
|
|
【 摘 要 】
Porous pavements are considered an alternative to increasing the city’s permeable surfaces and have great potential for rainwater harvesting. Over time, the surface layer clogs, limiting the application and use of porous pavement. This study aims to evaluate the maximum time for an intervention on a porous surface to recover its permeable properties before clogging. Through a constant load permeameter, rainwater runoff simulations were performed to measure the permeability coefficient of porous asphalt mixtures. Void content and interconnected voids were also evaluated. The parameter permeability showed a good indicator for determining when a surface layer will clog, and by taking regular measurements, the necessary intervention time to prevent it can be established. The designed porous mixture surface intervention should occur every year.
【 授权许可】
Unknown
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| RO202307010005486ZK.pdf | 908KB |
PDF