期刊论文详细信息
Engineering Proceedings
Accelerated Bridge Construction on Maui’s Hana Highway
article
Sean Oroho1  Tom Kubicz2 
[1] HDR Inc.;Federal Highway Administration—Central Federal Lands Highway Division
关键词: accelerated;    bridge;    construction;    Hana;    highway;    lateral;    slide;    FHWA;    ABC;   
DOI  :  10.3390/engproc2023036045
来源: mdpi
PDF
【 摘 要 】

Through the partnership between the Hawaii Department of Transportation (HDOT) and the Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration, six of the bridge structures along the State-owned portion of the Hana Highway will be replaced. Due to the nature of this road, and the limited opportunities for detours and road closures, along with context-sensitive solution design and right-of-way considerations, these structures will be replaced utilizing an accelerated bridge construction (ABC) technique known as a lateral bridge slide. To our knowledge, this project will be the first implementation of this ABC technique.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO202307010005206ZK.pdf 2368KB PDF download
  文献评价指标  
  下载次数:0次 浏览次数:0次