期刊论文详细信息
International Journal of Mining and Geo-Engineering
Robustness price of open-pit mine production scheduling
Aref Alipour1  Reza Tavakkoli-Moghaddam2  Ali Asghar Khodayari3  Ahmad Jafari3 
[1] Department of Mining Engineering, Urmia University of Technology, Urmia, Iran.;;School of Industrial Engineering &School of Mining Engineering, College of Engineering, University of Tehran;
关键词: open-pit;    production scheduling;    robust counterpart and uncertainty;   
DOI  :  10.22059/ijmge.2019.267417.594762
来源: DOAJ
【 摘 要 】

An Open-Pit Production Scheduling (OPPS) problem focuses on specifying block production scheduling to achieve the highest possible Net Present Value (NPV). This paper presents a new mathematical model for OPPS under uncertainty. To this end, a robust box and ellipsoidal counterpart approach was used. The proposed method was implemented in a hypothetical model. A Genetic Algorithm (GA) and an exact mathematical modeling approach were used to solve the model. It was shown that the scheduling of deterministic and robust models in various conditions is different. Considering the type of robust counterparts, different production plans under various conditions were scheduled. Furthermore, the price of robustness was determined for various levels of conservation.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:4次