期刊论文详细信息
Makara Journal of Technology
Maintenance Activity Planning by Reability Centered Maintenance II Method
Rachmad Hidayat1  Ali Imron1  Nachnul Ansori1 
[1] Jurusan Teknik Industri, Universitas Trunojoyo, PO BOX 2 Kamal Bangkalan, Madura 16912, Indonesia;
关键词: compresor screw, maintenance activity schedule plan, optimum time maintenance interval, rcm ii, risk assessment;   
DOI  :  10.7454/mst.v14i1.443
来源: DOAJ
【 摘 要 】

This research discuss maintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation is given to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation. From the research results with RPN points out that critical component that needs to get main priority in give maintenance on compresor screw are bust logistic on timeworn piston, and on filter's sponge airs to come out damage that gets RPN 45. Optimum maintenance interval point one that acquired to prevent failure on compresor screw smaller than appreciative MTTF which indicate optimum maintenance interval in avoiding its bust happening logistic component before happening damage.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次