期刊论文详细信息
Sustainability
Sequential Model for Long-Term Planning of Building Renewal and Capital Improvement
Agata Czarnigowska1  Robert Bucoń1 
[1] Department of Construction Methods and Management, Faculty of Civil Engineering and Architecture, Lublin University of Technology, 20-618 Lublin, Poland;
关键词: renovation planning;    facility management;    sustainability;    multi-criteria assessment;    decision support;    maintenance strategy;   
DOI  :  10.3390/su13179575
来源: DOAJ
【 摘 要 】

The paper puts forward a mixed integer linear programming model to support the long-term planning and budgeting for renewal and capital improvements of residential buildings, i.e., to select the optimal sequence of repair and improvement actions over a predefined planning horizon. The input is provided by the evaluation of the building performance according to a set of criteria. Then a set of possible repairs, replacements and improvements needs to be proposed together with the estimates of their cost and benefits; the latter are expressed by increments of building performance ratings according to predefined criteria. The renewal and modernization measures are not mutually independent: at least some of them are complementary and should be carried out in a specific order. The optimization problem was to define the order of renewal/improvement measures resulting with the highest benefits available within the budget, or to achieve the required levels of building performance at the lowest cost. A unique feature of the model is the approach to the constraints on sequential relationships between the measures and to their selection. The model can be used to construct long-term renewal and capital improvement plans.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次