期刊论文详细信息
Авіаційно-космічна техніка та технологія
GAS TURBINE UNITE INLET AIR COOLING BY USING AN EXCESSIVE REFRIGERATIONCAPACITY OF ABSORPTION CHILLER IN BUSTER AIR COOLER
Роман Миколайович Радченко1  Андрій Миколайович Радченко1  Богдан Сергійович Портной1  Веніамін Сергійович Ткаченко2  Сергій Анатолійович Кантор2 
[1] Національний університет кораблебудування ім. адмірала Макарова, Миколаїв, Україна;ПАТ "Завод "Екватор", Миколаїв, Україна;
关键词: охолодження;    повітря;    теплове навантаження;    бустерний повітроохолоджувач;    абсорбційнахолодильна машина;   
DOI  :  10.32620/aktt.2018.1.07
来源: DOAJ
【 摘 要 】

The processes of gas turbine unit inlet air cooling by absorption lithium-bromide chiller utilizing the turbine exhaust gas waste heat as athermotransformer has been analyzed for hour-by-hour changing ambient air temperatures and changeable heat loads on the air cooler as consequence. The computer programs of the firms-producers of heat exchangers were used for gas turbine unit inlet air cooling processes simulation. It is shown that at decreased heat loads on the air cooler an excessive refrigeration capacity of the absorption lithium-bromidechiller exceeding current heat loads is generated which can be used for covering increased heat loads on the air cooler and to reduce the refrigeration capacity of the absorption lithium-bromidechiller applied. To solve this task the refrigeration capacity required for gas turbine unit inlet air cooling is compared with an excessive refrigeration capacity of the absorption lithium-bromidechiller exceeding current heat loads summarized during 10 days of July 2015. The system of gas turbine unit inlet air cooling with a buster stage of precooling air and a base stage of cooling air to the temperature of about 15 °C by absorption lithium-bromide chiller has been proposed. An excessive refrigeration capacity of the absorption chiller generated during decreased heat loads on the gas turbine unit inlet air cooler that is collected in the thermal accumulator is used for gas turbine unit inlet air precooling in a buster stage of air cooler during increased heat loads on the air cooler. The results of gas turbine unit inlet air cooling processes simulation proved the reduction of refrigeration capacity of the absorption lithium-bromide chiller applied by 30-40 % due to the use of a buster stage of precooling air at the expanse of an excessive absorptionchiller refrigeration capacity served in the thermal accumulator. So the conclusion has been made about the efficient use of a buster stage of gas turbine unit inlet air cooler for precooling air by using an excessive refrigeration potential of absorption lithium-bromidechiller coolant saved in the thermal accumulator

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次