International Journal of Built Environment and Sustainability | |
THE PROPENSITY OF BUILDING INFORMATION MODELLING AND INTEGRATED PROJECT DELIVERY IN BUILDING CONSTRUCTION PROJECT | |
Rozana Mohamed Salleh1  Nafisah Abdul Rahiman1  Nur Emma Mustaffa1  Hamizah Liyana Tajul Ariffin1  Norazam Othman1  | |
[1] Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia.; | |
关键词: building information modelling; bim; integrated project delivery; ipd; | |
DOI : 10.11113/ijbes.v6.n1-2.386 | |
来源: DOAJ |
【 摘 要 】
The Building Information Modelling (BIM) implementation is to create a centralised knowledge sharing resource that contains all the necessary design and operational information about the project. BIM is a collaborative approach and integrated project delivery to design and delivery embraced by various construction teams in the construction projects. In the context of the most suitable project delivery to be used, with regards to the use of BIM, the Integrated Project Delivery (IPD) approach is highlighted as the best method which correlates building procurement of the design-to-construction business process through literature review analysis. IPD is developed as project delivery system that integrates people in effective collaborative approach between the key players in the project. IPD is going to be particularly beneficial for BIM because the contracts relation between the contractor, designers, consultants, constructors, sub-contractors and suppliers were binded and expressly determined at earlier stage. This relationship between these two subjects will helped the project team to achieve the project goals in terms of timely schedule, life cycle costs, quality and sustainability in construction project. Therefore, this study investigates on the propensity of the best methodology of project delivery system which can correlate with procurement adoption for projects adapt BIM concept. This is a descriptive study and the method used is based on review of the literature in relation to BIM and IPD. The analysis revealed that propensity of adopting IPD project delivery and the adoption of BIM are based on these factors: improve the communication, closer collaboration; liability and legal relationships are specifically determined, the best quality outcome; and lastly with reductions in design and construction period, it provides a cost effectiveness and a saving in overall construction period