Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study
Wan-Ting Huang1  Yu-Cheng Lin1  Yen-Pei Chen1  Chia-Chun Hong1 
[1] Department of Civil Engineering, National Taipei University of Technology (Taipei Tech), No.1, Sec.3, Chung-Hsiao East Road, Taipei 10608, Taiwan;
关键词: BIM;    building information modeling;    maintenance management;    facility management;   
DOI  :  10.3390/buildings6010008
来源: DOAJ
【 摘 要 】

Building information modeling (BIM) technologies use precise geometry and relevant data to enhance and improve the maintenance performance of facilities integrated with 3D object-oriented computer aided design (CAD). Although most owners agree on the potential benefits of integrating BIM technologies with facility management (FM), they must overcome many problems to plan and develop effective BIM execution plans for FM implementation. This study proposes and develops a BIM execution plan for BIM model management for FM during the pre-operation phase. Through the application of the proposed BIM execution plan, BIM can be effectively implemented during the operation and maintenance phases. In order to verify the proposed methodology and demonstrate its effectiveness in practice, the BIM execution plan is then applied in a selected case study of a building project in Taiwan. The combined results demonstrate that the proposed BIM execution plan is an effective approach for operation and maintenance management. The advantage of the proposed BIM execution plan lies not only in improving the efficiency of maintenance management work when integrated with BIM technologies, but also in maximizing the value and benefits of BIM to support maintenance management. Finally, limitations, difficulties, and suggestions are summarized for further development of the BIM execution plan for BIM model management during the pre-operation phase.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次