期刊论文详细信息
AIMS Energy
Developing a model for improving the productivity and energy production of small-scale power plants using the physical asset management model in a fuzzy environment
Mehrdad masoudnejad1  Siroos gholampoor2  Morteza rayati damavandi2 
[1] 1 Department of Civil Engineering, Sari Branch, Islamic Azad University, Sari, Iran;2 Department of Civil Engineering, Qaemshahr Branch, Islamic Azad University, Qaemshahr, Iran;
关键词: productivity| energy| physical asset management| Uptime Model| fuzzy TOPSIS;   
DOI  :  10.3934/energy.2018.6.1009
来源: DOAJ
【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次