期刊论文详细信息
Sustainability
Extreme Gradient Boosting-Based Machine Learning Approach for Green Building Cost Prediction
Ghassan Almasabha1  Odey Alshboul1  Ali Shehadeh2  Ali Saeed Almuflih3 
[1] Department of Civil Engineering, Faculty of Engineering, The Hashemite University, P.O. Box 330127, Zarqa 13133, Jordan;Department of Civil Engineering, Hijjawi Faculty for Engineering Technology, Yarmouk University, Shafiq Irshidatst, Irbid 21163, Jordan;Department of Industrial Engineering, King Khalid University, King Fahad St., Guraiger, Abha 62529, Saudi Arabia;
关键词: green buildings;    cost prediction;    machine learning;    extreme gradient boosting (XGBOOST);    deep neural network (DNN);    random forest (RF);   
DOI  :  10.3390/su14116651
来源: DOAJ
【 摘 要 】

Accurate building construction cost prediction is critical, especially for sustainable projects (i.e., green buildings). Green building construction contracts are relatively new to the construction industry, where stakeholders have limited experience in contract cost estimation. Unlike conventional building construction, green buildings are designed to utilize new technologies to reduce their operations’ environmental and societal impacts. Consequently, green buildings’ construction bidding and awarding processes have become more complicated due to difficulties forecasting the initial construction costs and setting integrated selection criteria for the winning bidders. Thus, robust green building cost prediction modeling is essential to provide stakeholders with an initial construction cost benchmark to enhance decision-making. The current study presents machine learning-based algorithms, including extreme gradient boosting (XGBOOST), deep neural network (DNN), and random forest (RF), to predict green building costs. The proposed models are designed to consider the influence of soft and hard cost-related attributes. Evaluation metrics (i.e., MAE, MSE, MAPE, and R2) are applied to evaluate and compare the developed algorithms’ accuracy. XGBOOST provided the highest accuracy of 0.96 compared to 0.91 for the DNN, followed by RF with an accuracy of 0.87. The proposed machine learning models can be utilized as a decision support tool for construction project managers and practitioners to advance automation as a coherent field of research within the green construction industry.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次