An Exact Algorithm for the Mode Identity Project Scheduling Problem | |
Behrouz Afshar Nadjafi1  Hamid Karimi2  Amir Rahimi2  | |
[1] Assistant Professor, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran;MSc, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran; | |
关键词: Project Scheduling; Branch and Bound; Mode-Identity; Multi-Mode; Resource Constrained; | |
DOI : | |
来源: DOAJ |
【 摘 要 】
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project scheduling problem with mode identity. The proposed algorithm is extended with some bounding rules to reduce the size of branch and bound tree. Finally, some test problems are solved and their computational results are reported.
【 授权许可】
Unknown