The electricity supply industry in the Democratic Republic of the Congo
E Uken1  J M Lukamba-Muhiya1 
[1] Energy Technology Unit, Cape Peninsula University of Technology, Cape Town, South Africa;
关键词: hydropower;    Democratic Republic of Congo (DRC);    electricity use;    public private partnership;   
DOI  :  10.17159/2413-3051/2006/v17i3a3261
来源: DOAJ
【 摘 要 】

The electricity supply industry of the Democratic Republic of Congo is reviewed, from the formation of the Societé National d’Electricité (SNEL) in 1970 until today. The DRC government established a national utility, because electricity is a key element in the socio -economic development of a country. Due to the national monopoly of SNEL, hydropower plants could be constructed such as Inga1 and Inga2. They supply power to mining in the Katanga province, and to a steel company in Maluku, not far from Kinshasa. Currently, Inga1 and Inga 2 are not operating at full capacity. Many hydropower and thermal plants are located in different provinces and need to be refurbished to increase their capacity of electricity for the DRC. Due to technical problems, SNEL only generates 1150 MW. The electrification programme in urban and rural areas across the DRC caters for less than 10% of the 60 million inhabitants. In 1980, the government implemented a policy called Plan Directeur de SNEL for electrification, but the policies never reached their objectives. No Energy White Paper exists which outlines the entire policy framework for energy supply and demand. Power sector reform has also not been implemented in the electricity sector. This paper outlines future government options in the electricity sector. Accordingly, the Public Private Partnership model could play a major role in attracting private partners to invest in the electricity sector in order to have different hydropower and thermal plants refurbished.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次