Rekayasa Sipil | |
Peningkatan Produktivitas Pada Proses Produksi Pracetak Dengan Penerapan Metode Lean Construction Untuk Eliminasi Waste | |
Agus Suharyanto1  Sri Murni Dewi1  Yunita Dwi Setyastuti2  | |
[1] Jurusan Teknik SipilFakultas TeknikUniversitas Brawijaya;Program Magister Teknik SipilFakultas Teknik, Universitas Brawijaya; | |
关键词: Lean Construction; Value Stream Mapping; Value Stream Analysis Tools; Critical Waste; Lead Time; Unification Process; | |
DOI : 10.21776/ub.rekayasasipil/2017.011.03.3 | |
来源: DOAJ |
【 摘 要 】
PT. X is one of the largest precast concrete industry in Indonesia, where to realize the vision, they continue to develop products and improve productivity performance by trying to improve quality of service, production process, and delivery product to customer with minimal cost and on time. To reach that purpose, needed Lean Construction method to eliminate waste and identify activities that can affect the products value-added.Research begins with description of the company's condition using Value Stream Mapping. Waste was identified by questionnaires, then analyzed by selection of mapping tools on Value Stream Analysis Tools and analyzed the root cause for suggestion of improvement. The results showed that the most critical waste that affectted productivity were defects (37.50%), unnecessary inventory (25%), and inappropiate processing (15%). Lead time required for overall of the process was 479.56 minutes and after improvement was reduced to 463.83 minutes by unification T.III / T.IV (fixing and tightening of the bolt plate) which reduced non-value added 15.73 minutes.