The ICDP Lake Bosumtwi Drilling Project: A First Report | |
关键词: Lake Bosumtwi Drilling Project; | |
DOI : 10.2204/iodp.sd.1.04.2005 | |
来源: DOAJ |
【 摘 要 】
SummaryThe 10.5 -km-diameter, 1.07-Ma Bosumtwi impactcrater was the subject of a multi-disciplinary and internationaldrilling effort of the International ContinentalScientific Drilling Program (ICDP) from July to October2004. Sixteen different holes were drilled at six locationswithin the lake, to a maximum depth of 540 m. A total ofabout 2.2 km of core material was obtained. Despite sometechnical and logistical challenges, the project has beenvery successful and it is anticipated that the first scientificresults will be available in late 2005.