Vestnik MGSU | |
Experimental investigations of the vertically loaded small scale bored piles | |
Glazachev Anton Olegovich1  | |
[1] Scientific-Research, Design-and-Engineering, Production Institute of a Building Complex of the Republic of Bashkortostan (BashNIIstroy); | |
关键词: bored pile; clay soils; static tests; deep mark; | |
DOI : | |
来源: DOAJ |
【 摘 要 】
At present, while evaluating bored piles load capacity in clay soils by CPT data, the depth of active area below the end face plane, within which the averaging of CPT values takes place, is taken as different in different Codes. Thus, for instance, in native Codes and Recommendations the depth of active area is taken from 2 to 4 pile diameters. In foreign Codes such as Belorussian, the depth of active area is taken up to 4 pile diameters and in European Codes - within 0,8-4 pile diameters. In order to specify the regularities of active area forming at different stages of loading, in-situ experimental investigations of large scale models have been carried out. At the test site, two small scale bored piles with the diameter of 130 mm were penetrated into the soil to the depth of 1100 m. The investigations were carried out in two stages: the first - pile static test with measuring of soil vertical displacements with the help of deep marks; the second - digging out soil around the pile and soil sampling at different depths. According to the results of the investigations carried out, the depth of the active area while reaching the limit state was determined to be about two pile diameters. With significant pile settlements (more than 0,58 d), the dimensions of this area do not exceed three pile diameters below the end face plane, and two diameters to the side from the pile axis. Within the lateral surface the significant variation of soil physical characteristics appears to be at the distance not less than 0,4 pile diameter from the lateral surface. Due to investigations’ results, it can be noted that in case of bored pile load less than the limit one, the depth of the active area is about two pile diameters. When the pile reaches its limit state, that provokes significant settlements, zone of compaction does not exceed three diameters to the depth and two diameters to the side from the pile axis.
【 授权许可】
Unknown