期刊论文详细信息
International Journal of Production Management and Engineering
Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm
Naglaa Ragaa1  Hegazy Zaher1  Mohammad Zakaraia1 
[1] Cairo University;
关键词: metaheurisitcs;    differential evolution algorithm;    u-shaped assembly line balancing problem;    multi-manned assembly line balancing problem;    chance-constrained programming;   
DOI  :  10.4995/ijpme.2021.16084
来源: DOAJ
【 摘 要 】

The U-shaped assembly lines help to have more flexibility than the straight assembly lines, where the operators can perform tasks in both sides of the line, the entrance and the exit sides. Having more than one operator in any station of the line can reduce the line length and thereby affects the number of produced products. This paper combines the U-shaped assembly line balancing problem with the multi-manned assembly line balancing problem in one problem. In addition, the processing times of the tasks are considered as stochastic, where they are represented as random variables with known means and variances. The problem is formulated as a mixed-integer linear programming and the cycle time constraints are formulated as chance-constraints. The proposed algorithm for solving the problem is a differential evolution algorithm. The parameter of the algorithm is optimized using experimental design and the computational results are done on 71 adapted problems selected from well-known benchmarks.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次