期刊论文详细信息
Frontiers in Energy Research
Corrigendum: Two-Stage Stochastic Scheduling of Integrated Electricity and Natural Gas Systems Considering Ramping Costs with P2G Storage and Wind Power
Houhe Chen1  Rufeng Zhang1  Tao Jiang1  Chuqiao Lin1  Xiaozhe Song2 
[1] Department of Electrical Engineering, Northeast Electric Power University, Jilin, China;State Grid Jilin Electric Power Company Limited, Changchun, China;
关键词: power-to-gas;    ramping cost;    wind power accommodation;    stochastic programming;    natural gas system;   
DOI  :  10.3389/fenrg.2021.664782
来源: DOAJ
【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次