期刊论文详细信息
Energies
Schedule-Based Operation Method Using Market Data for an Energy Storage System of a Customer in the Ontario Electricity Market
Sang-Yun Yun1  Pyeong-Ik Hwang2  Seong-Chul Kwon3 
[1] Department of Electrical Engineering, Chonnam National University, 77 Yongbong-ro, Buk-gu, Gwangju 61186, Korea;Department of Electrical Engineering, Chosun University, 309 Pilmun-Daero, Dong-Gu, Gwangju 61452, Korea;Korea Electric Power Research Institute (KEPRI), Korea Electric Power Corporation (KEPCO), 105 Munji-Ro, Yuseong-Gu, Deajeon 34056, Korea;
关键词: energy storage system;    electricity charge reduction;    market data;    Ontario electricity market;    optimal dispatch;    schedule-based operation;   
DOI  :  10.3390/en11102683
来源: DOAJ
【 摘 要 】

A new operation method for an energy storage system (ESS) was proposed to reduce the electricity charges of a customer paying the wholesale price and participating in the industrial conservation initiative (ICI) in the Ontario electricity market of Canada. Electricity charges were overviewed and classified into four components: fixed cost, electricity usage cost, peak demand cost, and Ontario peak contribution cost (OPCC). Additionally, the online market data provided by the independent electricity system operator (IESO), which operates the Ontario electricity market, were reviewed. From the reviews, it was identified that (1) the portion of the OPCC in the electricity charges increased continuously, and (2) large errors can sometimes exist in the forecasted data given by the IESO. In order to reflect these, a new schedule-based operation method for the ESS was proposed in this paper. In the proposed method, the operation schedule for the ESS is determined by solving an optimization problem to minimize the electricity charges, where the OPCC is considered and the online market data provided by the IESO is used. The active power reference for the ESS is then calculated from the scheduled output for the current time interval. To reflect the most recent market data, the operation schedule and the active power reference for the ESS are iteratively determined for every five minutes. In addition, in order to cope with the prediction errors, methods to correct the forecasted data for the current time interval and secure the energy reserve are presented. The results obtained from the case study and actual operation at the Penetanguishene microgrid test bed in Ontario are presented to validate the proposed method.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次