期刊论文详细信息
Energies 卷:8
Multi-Objective Reservoir Optimization Balancing Energy Generation and Firm Power
Fang-Fang Li1  Jun Qiu2 
[1] College of Water Resources & Civil Engineering, China Agricultural University, Beijing 100083, China;
[2] Institute for Aero-Engine, School of Aerospace Engineering, Tsinghua University,Beijing 100084, China;
关键词: firm power;    hydropower;    reliability;    multi-objective optimization;    NSGA-II;    Three Gorges project;   
DOI  :  10.3390/en8076962
来源: DOAJ
【 摘 要 】

To maximize annual power generation and to improve firm power are important but competing goals for hydropower stations. The firm power output is decisive for the installed capacity in design, and represents the reliability of the power generation when the power plant is put into operation. To improve the firm power, the whole generation process needs to be as stable as possible, while the maximization of power generation requires a rapid rise of the water level at the beginning of the storage period. Taking the minimal power output as the firm power, both the total amount and the reliability of the hydropower generation are considered simultaneously in this study. A multi-objective model to improve the comprehensive benefits of hydropower stations are established, which is optimized by Non-dominated Sorting Genetic Algorithm-II (NSGA-II). The Three Gorges Cascade Hydropower System (TGCHS) is taken as the study case, and the Pareto Fronts in different search spaces are obtained. The results not only prove the effectiveness of the proposed method, but also provide operational references for the TGCHS, indicating that there is room of improvement for both the annual power generation and the firm power.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次