Three classes of Earliness-Tardiness (E/T) scheduling problems | |
Ganiyu Ajisegiri1  Saheed Akande2  | |
[1] Corresponding author.; | |
[2] Department of Mechanical and Mechatronics Engineering, Afe Babalola University, Ado-Ekiti P.M.B 5454, Nigeria; | |
关键词: Tolerance window; Linear Composite Objective Function; Just-In-Time; Earliness–Tardiness scheduling problems; Delivery reliability; | |
DOI : | |
来源: DOAJ |
【 摘 要 】
In this work, the tolerance window defined as the variations of gains and penalty associated with the earliness component of the Linear Composite Objective Function (LCOF) of Earliness–Tardiness (E/T) scheduling problems were explored to establish three different classes of the problem. Two variants of E/T problems has been established in the literature; the problems with unknown due-date with the objective of optimizing jobs due-date and the problems with a known due-date for optimizing the E/T cost function. The latter variant considered in this work applies the concept of Just-In-Time (JIT) as the basis for optimizing the E/T cost function. However, while the ideal JIT schedule which tends towards zero LCOF is notional, the deviation is a function of the tolerance window. To the best of the researchers’ knowledge, there is a gap between the measures of the deviation called the delivery reliability or penalty cost function and the tolerance window. This work closes the gap. A numerical example was solved to demonstrate the three problem classes’ utility using the Early Due Date (EDD) algorithm as the hypothetical solution.
【 授权许可】
Unknown