Three classes of Earliness-Tardiness (E/T) scheduling problems
Ganiyu Ajisegiri1  Saheed Akande2 
[1] Corresponding author.;
[2] Department of Mechanical and Mechatronics Engineering, Afe Babalola University, Ado-Ekiti P.M.B 5454, Nigeria;
关键词: Tolerance window;    Linear Composite Objective Function;    Just-In-Time;    Earliness–Tardiness scheduling problems;    Delivery reliability;   
DOI  :  
来源: DOAJ
【 摘 要 】

In this work, the tolerance window defined as the variations of gains and penalty associated with the earliness component of the Linear Composite Objective Function (LCOF) of Earliness–Tardiness (E/T) scheduling problems were explored to establish three different classes of the problem. Two variants of E/T problems has been established in the literature; the problems with unknown due-date with the objective of optimizing jobs due-date and the problems with a known due-date for optimizing the E/T cost function. The latter variant considered in this work applies the concept of Just-In-Time (JIT) as the basis for optimizing the E/T cost function. However, while the ideal JIT schedule which tends towards zero LCOF is notional, the deviation is a function of the tolerance window. To the best of the researchers’ knowledge, there is a gap between the measures of the deviation called the delivery reliability or penalty cost function and the tolerance window. This work closes the gap. A numerical example was solved to demonstrate the three problem classes’ utility using the Early Due Date (EDD) algorithm as the hypothetical solution.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:4次