期刊论文详细信息
Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika 卷:0
SELECTING THE DIRECTION FOR TECHNICAL RE-EQUIPMENT OF THE TPP OIL-GAS BLOCKS OF 300 MW CAPACITY IN THE COUNTRIES OF THE EAST-EUROPEAN REGION
V. M. Neuimin1 
[1] LLC Energobezopasnost and LLC TSPC;
关键词: power block renovation;    oil-gas blocks;    technical re-equipment;    countries of the east-european region;   
DOI  :  
来源: DOAJ
【 摘 要 】

The author presents analysis of renovation variants for 300 MW oil-gas power blocks: substitution of the steam-power energy blocks by those with gas-steam cycle units, technical re-equipment of the energy blocks by means of reconstruction or modernization of the steam turbine, substitution implementation of the steam turbine with an analogous new one, prolongation of the operation life of the equipment in service. Renovation variants for the power blocks of the specified type in the TPPs of Russia can be chosen based on various engineering solutions concluded on the following grounds: mediumand long-term perspectives of their fuel balance structure (natural gas, synthetic gas fuel-oil residual, pulverized coal fuel including clean-coal and coal-benefication production wastes); the demands laid by JSC the JI UES on the participation of power blocks in frequency regulation and node inter-flow; development in the country of the distributed generation and the perspectives associated with it of the reconstructed TPPs installed capacity utilization in corresponding power-grid nodes; the development of related industries of the country’s economy; the speed of mastering the eco-friendly homegrown steam-gas and coal technologies; creation of the competitive national element base of microelectronics.Introduction of foreign steam-gas generators in this country requires development of the repair-and-service maintenance, provokes elevated risks and tangible costs, conduces to level decrease in the energy and national safety of the state. Orientation of the country’s power engineers to foreign gas-turbines of large single-unit capacity does not contribute to domestic power-plant industry development. With the view of reduction in value of the TPP-equipment by 12–15 %, it is prudent for power engineers to form a perspective manufacturing order for the period after 2016. In light of emerging political and economic situation in the world, technical re-equipment of the TPPs in the countries of the East-European region in the medium term is going to follow the way of reconstruction/modernization of the 300 MW-capacity power-block equipment and prolongation of the specified operation life.

【 授权许可】

Unknown   

  文献评价指标  
  下载次数:0次 浏览次数:0次