期刊论文详细信息
Rem: Revista Escola de Minas
Simulations of Vertimill Pilot Scale tests for Itabirite
Douglas Batista Mazzinghy1  José Francisco Cabello Russo1  Roberto Galéry1  Claudio Luiz Schneider1 
关键词: Vertimill;    Simulation;    Grinding;    Population Balance Model;    Itabirites;    ModsimTM;    vertimill;    simulação;    moagem;    modelo do balanço populacional;    itabiritos;    ModsimTM;   
DOI  :  10.1590/0370-44672015680014
来源: SciELO
PDF
【 摘 要 】

The Minas-Rio Project is the biggest project from Anglo American in the world and considers Vertimill in the regrinding circuit to adequate the particle size distribution to feed slurry pipeline that will pump the ore from Conceição do Mato Dentro in Minas Gerais State to Acu Port in Rio de Janeiro State, Brazil. A Vertimill pilot test campaign was carried out at Metso's pilot plant facility located in York city, Pennsylvania State, USA, to provided information to sizing the industrial grinding circuit. The main objective of this work is proposing a way to simulate the industrial Vertimill using the population balance model, normally used to simulate ball mills. The simulations were based on the selection and breakage functions determined from the laboratory tests using a batch ball mill. The simulations were performed using a Vertimill model implemented in the ModsimTM plant-wide simulator. The results of simulations shows that was possible to simulate the pilot tests, with good accuracy, considering simple laboratory tests with small quantities of samples.

【 授权许可】

CC BY   
 All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License

【 预 览 】
附件列表
Files Size Format View
RO202005130133765ZK.pdf 710KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:69次