期刊论文详细信息
Rem: Revista Escola de Minas
Estimate of hourly productivity applied to elaboration and implementation of mining plans
Edmo Da Cunha Rodovalho2  Ivo Eyer Cabral1 
[1] ,Universidade Federal de Alfenas Poços de Caldas Minas Gerais ,Brasil
关键词: Mine planning;    hourly productivity;    multiple regressions;    operational management;    Plano de lavra;    produtividade horária;    regressões múltiplas;    gerenciamento operacional;   
DOI  :  10.1590/S0370-44672014000200015
来源: SciELO
PDF
【 摘 要 】

In order to elaborate a mine plan, it is necessary to adopt hourly production parameters for the equipment available for its execution. This equipment should be in synchrony with the productive capacity of the operational units in the mine for: rock drilling, blasting, loading and transporting ore. This study deals with the estimate of hourly production indexes for loading and transport obtained by the use of multiple regressions. Using a management system database from an operating mine, equations were generated to explain the productive cycle of each of the loading machines and dump trucks. Knowing the behavior of the principle variables that exert influence on the production schedule, it was possible to estimate the index and to guarantee high feasibility for the mine plan, considering the indexes obtained were very close to those executed. The model design was created in a simple manner, using statistical concepts and computational tools, being supported by good correlation between the variables. This factor was decisive in obtaining good results in the execution of the studied mining plan.

【 授权许可】

CC BY   
 All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License

【 预 览 】
附件列表
Files Size Format View
RO202005130133724ZK.pdf 343KB PDF download
  文献评价指标  
  下载次数:20次 浏览次数:7次