Energies
Optimal Sizing of Battery Storage Systems for Industrial Applications when Uncertainties Exist
Guido Carpinelli2  Anna Rita di Fazio1  Shahab Khormali2 
[1] Department of Electrical Engineering and Information, University of Cassino and Southern Lazio, Cassino 03043, Italy; E-Mail:;Department of Electrical Engineering and Information Technology, University of Napoli Federico II, Naples 80125, Italy; E-Mails:
关键词: smart grid;    demand response;    storage systems;    sizing;    decision theory;   
DOI  :  10.3390/en7010130
来源: mdpi
PDF
【 摘 要 】

Demand response (DR) can be very useful for an industrial facility, since it allows noticeable reductions in the electricity bill due to the significant value of energy demand. Although most industrial processes have stringent constraints in terms of hourly active power, DR only becomes attractive when performed with the contemporaneous use of battery energy storage systems (BESSs). When this option is used, an optimal sizing of BESSs is desirable, because the investment costs can be significant. This paper deals with the optimal sizing of a BESS installed in an industrial facility to reduce electricity costs. A four-step procedure, based on Decision Theory, was used to obtain a good solution for the sizing problem, even when facing uncertainties; in fact, we think that the sizing procedure must properly take into account the unavoidable uncertainties introduced by the cost of electricity and the load demands of industrial facilities. Three approaches provided by Decision Theory were applied, and they were based on: (1) the minimization of expected cost; (2) the regret felt by the sizing engineer; and (3) a mix of (1) and (2). The numerical applications performed on an actual industrial facility provided evidence of the effectiveness of the proposed procedure.

【 授权许可】

CC BY   
© 2014 by the authors; licensee MDPI, Basel, Switzerland.

【 预 览 】
附件列表
Files Size Format View
RO202003190030190ZK.pdf 330KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:19次